1. Sigma Pro Solar PCU 10/120v
2. UTL Solar Panel 590Watt Bifacil Topcon
3.
Installation GI Stand , Mid Clamp ,Z Clamp, Fashaner,
Base plate,Digeri Engel,DC DV BOX 2in 1out ,DC
wire,M4 connector, flexible pipe
4. Battery (150AH) 36+24=60 month warranty
Company Scope
1. Engineering :-
Plant capacity determination.
Complete Structure balance of material.
To provide complete SLD.
Equipment layout.
Earthing layout.
String Design.
Cable Sizing.
To provide detail structure design.
Cable trench.
Approval of Customer.
2. Procument Process :-
Purchasing of panels.
Purchasing of Inverters.
Purchasing of Structure Materials.
Purchasing of Balance of Material.
Determine if inventory is sufficient to meet needs.
Review requisition orders, in order to verify accuracy, terminology standards &
Specifications.
3. Structure & Panel Placement:-
Module Installation.
Structure Installation.
4. Inverter DC, AC, Electrical Work:-
Panel Inter Connection.
MC4 connector connection.
Cable trench Work.
Inverter Installation.
DCDB Installation.
ACDB installation.
5. LA & Earthing Pit work:-
Complete Installation of LA.
ESE lightening arrestor installation as per Indian standard.
3mtr Earthing rod installation.
Earth pit foundation.
Checking Earth pit resistance.
Inverter Earthing.
6. Testing & Handover Plant:-
Testing all electrical procument [PV module, Inverter, DCDB, ACDB]
Testing and Checking earthing pit resistance.
Checking electrical wiring.
Handovering the plant.
Warranty :
Performance warranty 90% for 10 Years & 80% for 15 Years for PV Modules
warranty is in the scope of manufacturer.(25 Years)
Inverter warranty of 10 Years form manufacturer.
AMC will be charge extra after 1years, AMC after 1years will be signed separately.
(optional)
Payment Terms:-
25% during order confirmation.
60% before material dispatch.
15% after installation, before net metering.
Client Scope :-
Provide shadow free open space, with clear roof, free of any encumbrances like trees/plants or
equipment or dummy pillars etc.
In case of Projects with net-metering, Customer should additionally pay for the cost of required
in distribution system i.e. Bi-directional meters/ CTPT Sets and connected load or contracted
demand increase, as per the actual estimate provided by DISCOM.
Provide safe and secure storage area for the project components, upon receipt at site.
Provide power and water required for civil construction and erection works.
Provide necessary internet connectivity to the inverter for remote monitoring of energy generation.
Terms & Condition :-
Under standard conditions, we will install the system within 45 - 60 days upon receipt of
85% advance and clearance, if needed, from appropriate agencies.
The price mentioned in the proposal is valid for 3 days.
We will ensure that installation and commissioning of system fulfill regulatory guidelines
and are up to best accepted standards.
All govt documentation, permits and approvals will be taken care by our team.
The cost of net meter/ bi-directional meter will be borne by Customer.
Subject to extra payment is any.
Cancellation Charges
Cancellation charges won’t be imposed if an order is cancelled within 7 days from the day of
order confirmation.
Post 7th day, the cancellation will be subject to discretion of our company and there will be a nominal
cancellation charges of 15% of system cost.
There will be no refund after the materials are dispatched to the customer’s site.